Located at 119 West Esplanade, North Vancouver, The Promenade posed several challenges due to the history of the land. The ground was heavily contaminated which slowed down productions for both excavation and shoring. The Promenade was completed in 7 months and included 38,800m³ of excavation, 2,400m² of shotcrete, and 5,200m of anchor. Due to the proximity of the project to the ocean, SWC also installed jet grout columns for the bottom half of the project to cut off the water.

PROJECT SUMMARY

Owner: Polygon Homes

Completion: November 2017

Engineer: GeoPacific Consultants Ltd.

SWC Supervisor: Phil Brisette / Dave Martin

Excavation and Shoring – The Promenade Excavation and Shoring – The Promenade