"Run of the river" hydroelectric power requires large thrust block forces as the pipeline snakes its optimum route from the mountain-top to the turbine below.

Rock and soil anchors were drilled at precise angles in various soil conditions, in very remote and almost inaccessible terrains.

Miller Creek Soil Anchors Miller Creek Soil Anchors