Excavation and Shoring

Excavation and Shoring

Southwest Contracting was the first excavation contractor in the Lower Mainland to combine both excavation and shoring to best serve our clients.

Excavation and Shoring Contractors

How we can help

We make use of many different shoring methods including the drilling of IBO anchors in caving ground, drilled vertical piles (so anchors can span utilities), and specialty drilling and grouting techniques to maintain the integrity of an excavation. Our shoring method of choice for many projects in Vancouver is shotcrete shoring due to the dominance of native glacial till throughout the region. It is usually 50% more economical than shoring with soldier piles and lagging. Also, jet grouting, soil mixing or secant walls in combination with tieback anchors have been introduced to hold water-bearing ground.

While larger projects such as the Vancouver Convention Center are noteworthy, the smaller projects to install shear walls within existing buildings are becoming commonplace as well as new codes for seismic upgrading are implemented. Our 20 or so machines cover the full spectrum of services required of complete Lower Mainland excavation contractors.

Related Projects

John Hart Dam Tunnel Portal Shoring

January 2015   Cambell River, BC

PROJECT SUMMARY General Contractor:  Aecon / SNC-Lavalin Joint Venture (ASJV)Location:  Campbell River,... View Project  

Evergreen Rapid Transit Line

December 2013   Port Moody, BC

This project displays the versatility and efficiency of all of SWC's divisions - ground improvement techniques,... View Project  

Architectural Wall – Coquitlam Watershed

October 2013   Coquitlam, BC

For this project, SWC installed temporary and permanent shotcrete walls to facilitate construction of the Coquitlam... View Project  

Deep Soil Mixing | Still Creek Works Yard

May 2013   Burnaby BC

Soil-mixed ground improvement was designed as the foundation for two new buildings at the Still Creek Works Yard... View Project  

TELUS Gardens

November 2012   Vancouver, BC

Shoring and excavation for the TELUS Gardens Project included demolition of existing structures, 81,600 cubic yards... View Project  

Surrey Civic Center

September 2012   Surrey BC

The project included construction of the new Surrey Civic Centre and Municipal Hall, on the corner of 104th Street... View Project  

Maddox

February 2012   Vancouver, BC

Excavation for the Maddox in Vancouver involved excavating 53,000 yd³ of material to a depth of 60', as well as the... View Project  

Highway 99 Bus Lane

September 2011  

The project required an additional dedicated bus lane on Highway 99 from Steveston to Cambie Street. As part of... View Project  

Calgary West LRT

August 2011   Calgary, AB

Shotcrete shoring work was done as part of an 8.1km extension of Calgary's existing Light Rapid Transit system. As... View Project  

Pitt Meadows Ice Arena

March 2011   Pitt Meadows, BC

Installation of 110 Mini-Jet grouted Titan 40/16 or Titan 52/26 micropiles installed to replace original timber... View Project  

Harbour Green 3

September 2009   Vancouver, BC

ASPAC’s signature building for the third phase of Harbour Green required excavation, shoring, jet grouting,... View Project  

The Pier

January 2006   North Vancouver, BC

Water-bearing sands being fed from the mountains above the base of the North Shore Mountains were intercepted with... View Project  

Vancouver General Hospital: Academic Ambulatory Care Centre

May 2005   Vancouver, BC

This P3 project was on a critical timeline. Very dense layers of siltstone and sandstone for the full depth of 50’... View Project  

Highgate

April 2005   Burnaby, BC

This project includes a four level underground parkade to approximately 40’ depth. Underpinning of adjacent parkade... View Project  

Little Mountain Reservoir

May 2003   Vancouver, BC

An interior berm within the 215,000 square foot existing reservoir was removed and replaced with a vertical... View Project