Foundation Support

Foundation Support

Foundation Support Services

Southwest Contracting carries multiple drilling rigs to suit the most difficult site constraints. For more information on Micropiling and how Southwest Contracting can help your next project, contact one of our estimators today.

Related Projects

Bon Accord

November 2014   Bon Accord Creek, Surrey

PROJECT SUMMARY Owner:  City of SurreyGeneral Contractor:  B&B Heavy Civil Construction LtdLocation:  Bon... View Project  

Cheakamus River Pedestrian Bridge, Whistler

October 2014   Sea to Sky Trail at Cheackamus River Crossing, Whistler, BC

PROJECT SUMMARY Owner:  Resort Municipality of WhistlerGeneral Contractor:  Kingston ConstructionCompletion: ... View Project  

6600 Marine Drive

January 2014   West Vancouver, BC

This project involved reinforcing an existing stacked rock retaining wall at the 6600 block of Marine Drive in West... View Project  

BC Hydro North Bank

January 2012   Taylor, BC

This project involved the installation and testing of one pre-production anchor and the installation of six... View Project  

Pitt Meadows Ice Arena

March 2011   Pitt Meadows, BC

Installation of 110 Mini-Jet grouted Titan 40/16 or Titan 52/26 micropiles installed to replace original timber... View Project  

Harbour Green 3

September 2009   Vancouver, BC

ASPAC’s signature building for the third phase of Harbour Green required excavation, shoring, jet grouting,... View Project  

TELUS Cell Tower

July 2009   Mt Poole, Queen Charlotte Islands

Installation of 3 pile foundations for TELUS cell phone tower on Mt Poole in the Queen Charlotte Islands (now Haida... View Project  

Vanterm Berth Extension

April 2002   Burrard Inlet, BC

The design of choice by the Vancouver Port Authority for anchoring marine piling to resist seismic tension forces... View Project  

Miller Creek Soil Anchors

January 2002   Pemberton, BC

"Run of the river" hydroelectric power requires large thrust block forces as the pipeline snakes its optimum route... View Project  

Rapid Transit Project 2000 Ltd.

January 2001   Vancouver, BC

Summary: Grandview Cut Guideway Shoring Southwest Contracting chose to modify the standard shoring method commonly... View Project  

Glenayre Parkade for PCL

January 1999   Vancouver, BC

100,000 cyds excavation, strand tieback anchors and shotcrete shoring. This project required careful anchor... View Project  

West Coast Express Expansion

January 1996   Port Moody, BC

As part of the track-widening program for the implementation of the West Coast Express, CP Rail required that a... View Project  

Vancouver Heights Reservoir Seismic Upgrade

January 1996   Vancouver, BC

The GVRD began upgrading the reservoirs to new seismic codes in the 1990’s. One of the first reservoirs upgraded... View Project