BC Children’s Hospital Design Build – Teck Acute Care Centre
Project Details
Vancouver
Client:
Belfour Beatty & Ledcor Construction
Location:
Vancouver
Division:
Infrastructure
Year Completed:
2014
Project Description
Southwest Contracting was awarded the contract for bulk excavation, shotcrete shoring, and onsite civil works to prepare the foundation for the landmark Teck Acute Care Centre. The team managed complex earthworks and site servicing and assisted with precision as-built construction to support the eight-storey medical facility. Operating directly within an active healthcare campus, our crews successfully navigated these intricate civil constraints with zero disruption to surrounding critical hospital operations.