Assisting Vancouver Pile Driving with the placement of riprap spurs in the Fraser River to slow stream flows in the vicinity of the Inch Creek waterline crossing beneath the riverbed, helping to prevent erosion and scouring around the pipe. Work was undertaken during the fish window period, with crews working in riparian areas without causing damage to the riverbank.