Installed tie-back anchors for the design-build temporary shoring system for the new St. Paul’s Hospital in Vancouver. In total, 546 strand anchors of varying capacities (4–12 strands), totaling 11,378 m, and 197 hollow-core anchors, totaling 3,433 m, were installed. SWC fabricated the strand anchors, up to 31 m in length, on site.