BC Children’s and Women’s Hospital
Project Description
As part of the development of the TECK Acute Care Center for the BC Children’s and BC Women’s Hospital, SWC was contracted to provide all of the site civil work, as well as the excavation and shoring.
Site civil work included installation of the sanitary sewer, storm sewer, water main, communication ducts, an Atlantis-D storm tank, and and a decontamination tank.
Earthworks and shoring included bulk excavation, detail excavation, 7300 lineal meters of drilling and anchor installation.
This project showcases the versatility of SWC. As it was a design-build project, changes to design and drawing revisions were frequent. Having Excavation, Shoring and Civil divisions which work together and communicate effectively was of paramount importance to providing high-quality, efficient work for the successful completion of the project.
Project Details
DATE
August 1, 2015
General Contractor
CWH Design-Build GP
CLIENT
Children’s and Women’s Hospital Design-Build GP
LOCATION
Vancouver, BC
PROJECT MANAGER
Dave Martin (Shoring) / Jeff Fletcher (Excavation) / Randy Morphy (Civil)
PROJECT TYPE
Project Gallery
CONTACT US
Ask us how we can work together to advance your heavy construction goals. From shotcrete shoring, jet grouting and bulk excavation, to underground utility installation, road building, hydraulic drilling for tiebacks, seismic anchors, and micropiles, SWC is synonymous with quality, reliability and innovation.