Little Mountain Reservoir
Project Description
An interior berm within the 215,000 square foot existing reservoir was removed and replaced with a vertical shotcrete wall supported by 40,000ft. of soil anchors.
As-built
Excavation Volume: ~78,500 cubic yards
Shotcrete Fill Anchors: 1,020 ea x ~30’ = 30,600 Ft
Shotcrete Till Anchors: 481 ea x ~20’ = 10,200 Ft
Shotcrete Shoring Wall Area: 49,000 sq. feet
Seismic Shotcrete Slab/Beam: 7,700 sq. feet
Description
This fast-track project required critical deadlines to be met.
Other elements of the project included a 65”-diameter emergency drain-down pipe from the center of the reservoir to an outflow chamber.
A reinforced structural shotcrete slab/beam integrating the floor and perimeter wall over an old rock quarry was required to transfer seismic loads and to prevent water intrusion.
SWC met all of the milestones, despite site congestion and very difficult drilling conditions through fill materials.
Project Details
DATE
May 1, 2003
CLIENT
Graham Industrial Services Ltd.
LOCATION
Vancouver, BC
PROJECT MANAGER
Rudy Froese
PROJECT TYPE
Project Gallery
CONTACT US
Ask us how we can work together to advance your heavy construction goals. From shotcrete shoring, jet grouting and bulk excavation, to underground utility installation, road building, hydraulic drilling for tiebacks, seismic anchors, and micropiles, SWC is synonymous with quality, reliability and innovation.